Construction of photovoltaic plant
Project: “LA TRINIDAD III” photovoltaic plant (30 mW)
Location: Durango, Messico.
Start date: April 2, 2019
Activities:
- Construction of continuous foundation, concrete f’c=300kg/cm².
- Driving and installation of support posts.
- Enabling and assembly of metal structure in aluminum and stainless steel.
- Assembly of monocrystalline solar panels.
- Electromechanical installation for the use of the generated energy.