Construction of photovoltaic plant

Construction of photovoltaic plant

Project: “LA TRINIDAD III” photovoltaic plant (30 mW)
Location: Durango, Messico.
Start date: April 2, 2019
Activities:

  • Construction of continuous foundation, concrete f’c=300kg/cm².
  • Driving and installation of support posts.
  • Enabling and assembly of metal structure in aluminum and stainless steel.
  • Assembly of monocrystalline solar panels.
  • Electromechanical installation for the use of the generated energy.

 

82e60d1b-a3ab-4209-a805-c043e184c919
solar 1
solar 2
solar 3
solar 4