Horizontal Directional Drilling
Project: Directed horizontal drilling and installation of carbon steel pipes of different diameters, to be used as sleeves at Federal Highway and railway crossings, in Cananea, Sonora
Location:Cananea, Sonora
Start date: June 19th, 2023
Activities: Drilling and installation of 60 meters of 24-inch diameter pipe, standard schedule.
Drilling and installation of 72 meters of 30-inch diameter pipe, standard schedule.
Drilling and installation of 72 meters of 36-inch diameter pipe, standard schedule.
Drilling and installation of 24 meters of 42-inch diameter pipe, standard schedule.